The project consists of a four classroom and cafeteria addition to the existing K-6 Elementary School. The classrooms were needed to accommodate enrollment growth and the cafeteria was required so the school could use the existing gym/cafeteria solely for physical education programs.
The new addition also includes restrooms, a warming kitchen and MEP support spaces. We designed the structure to blend with the existing architecture so it would not distract from the original facility and its
main entry.